Day 5: Monday Nov 14th
10 am and the guys reappeared, suitably armed with extra roof tiles and a rail joiner. Two and a bit hours later the job was done. Rubbish cleaned up, rail complete, panel;s installed, wiring connected.
It had been a long haul but we we’re done (all bar the inverter, due on Wednesday). It looks neat, tidy and quite stylish on the roof – I’ll get a better picture once the scaffoldings gone. However, I’d be more impressed if it was working, since after all this was a not inconsiderable part of the reasoning for having it installed in the first place.
Finally - 14 panels in place!
No comments:
Post a Comment